Temporary Works
Planning & Design
Early Identification
Temporary works are identified early in the project planning process. This includes assessing where temporary structures or systems will be needed to support activities such as excavation, scaffolding, formwork for concrete, trench supports, and access routes.
Design Specifications
Early Identification: Temporary works are identified early in the project planning process. This includes assessing where temporary structures or systems will be needed to support activities such as excavation, scaffolding, formwork for concrete, trench supports, and access routes.
Integration with Permanent Works
Temporary works must be designed and planned to integrate seamlessly with permanent works to avoid conflicts or delays during construction.
Roles & Responsibilities
Temporary Works Coordinator (TWC)
A designated TWC is responsible for overseeing the management of all temporary works on-site. The TWC ensures that all procedures related to temporary works are followed, designs are approved, and necessary inspections are conducted.
Temporary Works Designer (TWD)
A qualified TWD is responsible for designing the temporary works in accordance with safety standards and ensuring that they are structurally sound.
Site Supervisor/Operatives
Trained site supervisors and operatives ensure the temporary works are installed as per the design and that any changes or risks are reported to the TWC.
Risk Assessment & Control
Site-Specific Risk Assessments
Before installing temporary works, a detailed risk assessment is conducted to identify potential hazards such as instability, worker safety, and interactions with permanent structures.
Control Measures
Control measures, such as barricades, signage, and inspections, are put in place to mitigate risks. These measures are reviewed and updated throughout the project lifecycle.
Installation & Inspection
Installation by Competent Personnel: Temporary works are installed by experienced and trained operatives according to the approved design and following the manufacturer’s guidelines.
Inspection & Certification
After installation, the temporary works undergo thorough inspections to ensure compliance with design and safety standards. The TWC, or a competent person, certifies the temporary works as safe for use.
Ongoing Monitoring
Temporary works are subject to regular inspections throughout the project, especially after any changes in environmental conditions (e.g. weather) or loads.
Modifications & Adjustments
Change Management
If any changes or adjustments to the temporary works are needed during construction, these are carefully managed through a formal process. Any modifications must be reviewed and approved by the TWC and TWD to maintain safety and integrity.
Removal & Demobilization
Safe Removal
Once the permanent works are complete and temporary works are no longer required, they are carefully dismantled and removed in a controlled manner. The removal process is also planned to avoid any impact on the permanent works.
Final Inspection
After removal, a final inspection of the area is conducted to ensure that the site is safe and ready for the next phase of work or handover.
Documentation & Compliance
Record Keeping
If any changes or adjustments to the temporary works are needed during construction, these are carefully managed through a formal process. Any modifications must be reviewed and approved by the TWC and TWD to maintain safety and integrity.
Compliance with Regulations
Temporary works management must comply with local regulations and industry standards, such as BS 5975 in the UK, which provides guidelines for managing temporary works.
Effective management of temporary works ensures that projects progress safely and efficiently, with minimal risk to personnel and structures. The coordination between design, planning, and execution teams is crucial in preventing accidents or delays.

Temporary Works Project Case Studies
Industry Clients & Partners
BPH Rail & Civil Engineering are proud to have worked in collaboration with the following industry clients and partners:
Planning a Temporary Works Project?
If you are planning a temporary works construction project and are looking for a dedicated contractor with a depth of expertise and experience, you should be talking to BPH Rail and Civil Engineering. We have a proven track record in in delivering temporary works for both rail, civil engineering and public sector projects.
Contact Us
Please contact our support team to discuss your project and the scope of the construction requirements. We will be happy to arrange a meeting with the appropriate member of our senior management team.
Call us: 01279 724913
Industry Accreditations & Certifications
BPH Rail & Civil Engineering have the following accreditations and certifications. Please visit our Accreditations page for more details.