Project Description

Seven Kings Drainage Renewal – Civils Framework

Client: Colas Rail

Start date and duration: February 2024, 52 hours

Description of the works (Scope):

BPH Rail & Civil Engineering were awarded the Seven Kings Drainage renewals project as part of Year 4 of the Anglia Civils Framework.

The work took place over a 52-hour possession within weekend 46, completed through five consecutive shifts.

BPH Rail was involved from the initial planning stages, participating in site visits and meetings, and continued through to project handover. The scope of work included material loading, site surveys, cable protection, excavation, and the installation of 130 meters of drainage, featuring one cross drain and five GRP catch pits.

The railway drainage project was essential due to poor drainage conditions along the track sidings, which posed a risk to the integrity of the rail infrastructure. Without proper drainage, track settlement and misalignment could occur, increasing maintenance costs and safety risks.

BPH Rail supplied the plant, labour, and safety equipment, while the client, Colas Rail, provided on-track plant and engineers. All personnel adhered to safety protocols such as exclusion zones and trench protection, ensuring a smooth and successful project execution.

All works was completed on time with no delays and no snagging items reported.